Project: 
Peterbilt Truck Dealership- Scott, LA
Owner: BM & M, LLC
Architect: WHL Architects
Description: This is a completely new truck dealership.  The main facility consists of a showroom, offices, part warehouse and service depart.  The work consists of lime stabilization, sitework,  storm retention ponds, concrete paving, masonry, misc. steel, rough and finish carpentry, wood framing, doors, frames and hardware, overhead coiling doors, drywall, insulation, painting, bath accessories, approximately 26,000 sf metal building, plumbing, an on-site wastewater treatment plant, oil water separators, trench drainage, electrical and light poles.
Start Date: October 2008
Completion Date: November 2009
Amount: $3,000,000
















Project: Louisiana State University Landscape Facility Relocation
Owner: State of Louisiana
Architect: Robert M. Coleman and Partners
Description: The project consists of a complete new facility for the University. The project has subsurface drainage, mass sitework, erosion control, termite treatment, fencing, limestone, geotextile fabric, concrete paving, concrete retaining walls, concrete curbs and gutters, structural building slabs, masonry, structural and miscellaneous steel, rough and finish carpentry, cold fluid applied waterproofing, clay tile roofing, joint sealants, fire sealants, pre finished metal coping, standing seam metal roofing, overhead doors, hollow metal doors, frames and hardware, storefront systems, metal studs, drywall, pre engineered light gauge metal trusses, acoustical ceiling tile, plaster, painting, resilient flooring, carpeting, epoxy flooring, specialties, extruded aluminum canopy, projection screen, two metal buildings (one approximately 13,500 sf and one approximately 3,500 sf), insulation, HVAC, and electrical.
Start Date: April 2008
Completion Date: April 2009
Amount: $2,548,000














Project: LSU Basic Sciences Greenhouse
Owner: Louisiana State University
Architect: Mougeot Architecture
Completion Date: February 2009
Amount: $150,500












Project: 
Eco Science Resource Group Office Building
Owner: Hall Lee Ventures, LLC
Architect :  Architects +
Completion Date: January 2009
Amount:  $2,000,000


















Project: Prairieville Retail Center 
Owner: Air-Wal, LLC 
Architect: Le Architect, LLC Engineer: ABMB 
Completion Date: January 07 
Amount: $1.9 million
























Project:
 Meineke Car Care Center 
Owner: David Frey Enterprises 
Architect: Sauviac and Dang 
Completion Date: January 2007 
Amount: $425,000

 


 






Project: LSU EBL Cattle Shade Structures 
Owner:
Louisianan State University AG Center 
Architect \ Engineer:
Roger Husser, P.E. LSU 
Completion Date:April 2007 
Amount:
$79,000













Project:
 Developmental Storage Facility 
Owner: Louisianan State University AG Center 
Architect \ Engineer: Roger Husser, P.E. LSU 
Description: The project consists of a new ground up Departmental Storage Facility. Sitework, Concrete, Reinforcement Steel, Miscellaneous Steel, Painting, Fire Extinguishers, Metal Building, Doors, and Electrical. 
Start Date: July 2006 
Completion Date: January 2007 
Amount: $124,500